Team capacity

Team capacity is how much more work people can take on, given their current assignments, attendance and recorded effort. Checking it before accepting a request prevents a deadline from slipping because the same person was assigned again. Working hours and leave set the total; assignments and recorded effort show how much of it is already taken.

The formula

  • Capacity = contracted hours − leave and holidays − fixed internal time.
  • Available hours = capacity − hours already assigned.
  • Utilization = billable hours ÷ paid hours. The utilization rate calculator works this out for a person or a team.

A worked example

An example. Five people work 40 hours a week: 200 hours. One is on leave for two days (−16), and weekly meetings and admin take 4 hours each (−20). Capacity is 164 hours. Current assignments add up to 150 hours, so 14 hours are free. A new 20-hour request does not fit this week without moving something.

How PLYNTUM handles it

On every plan, PLYNTUM keeps assignments on tasks, attendance, leave requests and logged time per person. The workload and capacity view, which puts them side by side per person and forecasts capacity, comes with Scale. See people and capacity and capacity planning.

See also what utilization rate measures, work management and all terms in the glossary.